The completed A Creaky Gantry warehouse

A Creaky Gantry

Rising unevenly above the Swarth Docklands, The Creaking Gantry is a towering patchwork of stone, timber and smoke-blackened brick. Its upper floors lean over the narrow streets below, supported by heavy beams and crooked braces, while cranes, hoists and pulley arms jut from its walls at awkward angles.

Warehouse build • Basement level available

Stone, timber and smoke-blackened brick

The Creaking Gantry

The ground floor serves as a busy warehouse where crates, barrels and dockside cargo are unloaded, counted and stored. Beneath it lies a cramped basement used for older stock, questionable goods and anything the owners would rather keep out of sight. Above, narrow stairs and rickety platforms wind between storerooms, offices and soot-filled machinery.

When the wind blows in from the harbour, the entire building creaks and shifts. Chains knock against the walls, timber joints groan and the suspended gantries sway above the dock. Locals insist that the building has always sounded that way, though few are willing to stand beneath it for very long.

Harbour Single Foundation

Assemble this harbour single foundation step by step

Follow the highlighted part through all 17 steps to build one compact Swarf Docklands foundation.

Print list: CW-0037 ×4 • CW-0012 ×4 • CW-0052 ×4 • CW-0033 ×4 • CW-0040 ×1

Harbour Double Foundation

Assemble this harbour double foundation step by step

Follow the highlighted part through all 27 steps, including the two new centre T-posts, to build the wider foundation.

Print list: CW-0037 ×6 • CW-0012 ×4 • CW-0069 ×2 • CW-0052 ×4 • CW-0070 ×2 • CW-0033 ×6 • CW-0068 ×1 • CW-0040 ×2

Step 1 of 28
Step 1: the cyan outline shows the top corner connector to place.
Place the highlighted piece Wood Connector Elbow Locked 60mm CW-0052 Legacy: CE L60W

Docklands Harbour Quad

Assemble the Docklands Harbour Quad step by step

Build a broad four-bay harbour foundation with double wall panels and a full perimeter of coping beams. Follow the highlighted component through all 16 steps.

Print list: CW-0072 ×4 • CW-0012 ×4 • CW-0052 ×4 • CW-0084 ×4 • CW-0076 ×1

Step 1 of 17
Step 1: the cyan outline shows the outer corner post to place.
Place the highlighted piece Braced Mooring Post Elbow 8mm CW-0012 Legacy: SD BMPE8

Docklands Harbour Single Rat Warren Exit

Assemble the Docklands Harbour Single Rat Warren Exit step by step

Create a compact harbour foundation with a concealed Rat Warren exit, sewer ladder and grated manhole. Follow the highlighted component through all 19 steps.

Print list: CW-0037 ×3 • CW-0081 ×1 • CW-0012 ×4 • CW-0052 ×4 • CW-0033 ×4 • CW-0090 ×1 • CW-0077 ×1 • CW-0079 ×1 • CW-0087 ×1

Step 1 of 20
Step 1: the cyan outline shows the culvert wall panel to place.
Place the highlighted piece Harbour Wall with Large Culvert SD HWLC Legacy: SD HWLC

Docklands Harbour Double Drain

Assemble the Docklands Harbour Double Drain step by step

Build a double harbour foundation around a large storm drain and cracked dockside floor. Follow the highlighted component through all 18 steps.

Print list: CW-0072 ×2 • CW-0037 ×2 • CW-0012 ×4 • CW-0052 ×4 • CW-0033 ×2 • CW-0084 ×2 • CW-0083 ×1 • CW-0085 ×1 • CW-0086 ×1

Step 1 of 19
Step 1: the cyan outline shows the wall panel to place.
Place the highlighted piece Double Harbour Wall CW-0037 Legacy: DH DHW

Docklands Harbour Quad Straight Rat Warren

Assemble the Docklands Harbour Quad Straight Rat Warren step by step

Add a straight Rat Warren beneath a large harbour foundation, complete with culvert access and sea steps. Follow the highlighted component through all 17 steps.

Print list: CW-0072 ×2 • CW-0073 ×1 • CW-0074 ×1 • CW-0012 ×4 • CW-0052 ×4 • CW-0084 ×4 • CW-0076 ×1 • CW-0089 ×1

Step 1 of 18
Step 1: the cyan outline shows the outer corner post to place.
Place the highlighted piece Braced Mooring Post Elbow 8mm CW-0012 Legacy: SD BMPE8

Docklands Harbour Quad Elbow Rat Warren

Assemble the Docklands Harbour Quad Elbow Rat Warren step by step

Turn the underground route beneath a quad harbour foundation with the elbow Rat Warren floor assembly. Follow the highlighted component through all 17 steps.

Print list: CW-0072 ×2 • CW-0073 ×1 • CW-0074 ×1 • CW-0012 ×4 • CW-0052 ×4 • CW-0084 ×4 • CW-0076 ×1 • CW-0088 ×1

Step 1 of 18
Step 1: the cyan outline shows the outer corner post to place.
Place the highlighted piece Braced Mooring Post Elbow 8mm CW-0012 Legacy: SD BMPE8

Docklands Low Harbour Single

Assemble the Docklands Low Harbour Single step by step

Assemble a compact low harbour foundation with a large storm drain set into the dock floor. Follow the highlighted component through all 17 steps.

Print list: CW-0082 ×4 • CW-0078 ×4 • CW-0071 ×4 • CW-0033 ×4 • CW-0083 ×1 • CW-0080 ×1

Step 1 of 18
Step 1: the cyan outline shows the low wall panel to place.
Place the highlighted piece Low Harbour Wall SD LHW Legacy: SD LHW

Docklands Low Harbour Double

Assemble the Docklands Low Harbour Double step by step

Build a longer low-profile waterfront foundation using single and double wall sections. Follow the highlighted component through all 16 steps.

Print list: CW-0082 ×2 • CW-0075 ×2 • CW-0078 ×4 • CW-0071 ×4 • CW-0033 ×2 • CW-0084 ×2 • CW-0085 ×1

Step 1 of 17
Step 1: the cyan outline shows the low wall panel to place.
Place the highlighted piece Low Harbour Wall SD LHW Legacy: SD LHW

Docklands Low Harbour Quad

Assemble the Docklands Low Harbour Quad step by step

Create the widest low-profile docklands footprint with four double walls and a continuous coping edge. Follow the highlighted component through all 16 steps.

Print list: CW-0075 ×4 • CW-0078 ×4 • CW-0071 ×4 • CW-0084 ×4 • CW-0076 ×1

Step 1 of 17
Step 1: the cyan outline shows the low double wall panel to place.
Place the highlighted piece Low Double Harbour Wall DH LDHW Legacy: DH LDHW

Warehouse Basement

Assemble the warehouse basement step by step

Build the stone basement shell, internal floor and timber access steps through 16 clearly highlighted placement steps.

Print list: CW-0037 ×2 • CW-0052 ×4 • CW-0070 ×2 • CW-0072 ×4 • CW-0093 ×1 • CW-0164 ×1 • CW-0092 ×1 • CW-0091 ×1

Step 1 of 17
Step 1: the cyan outline shows the harbour wall to place.
Place the highlighted piece Harbour Wall CW-0037Legacy: SD HW

Ground Floor

Assemble the ground floor step by step

Build the timber frame, breeze-block walls, stairway and floor through 36 clearly highlighted placement steps.

Print list: CW-0068 ×5 • CW-0093 ×2 • CW-0094 ×1 • CW-0095 ×10 • CW-0096 ×1 • CW-0097 ×2 • CW-0098 ×1 • CW-0099 ×1 • CW-0100 ×1 • CW-0101 ×2 • CW-0102 ×3 • CW-0103 ×4 • CW-0104 ×1 • CW-0105 ×2

Step 1 of 37
Step 1: the cyan outline shows the Wood Greebling Post 60mm to place.
Place the highlighted piece Wood Greebling Post 60mm CW-0095Legacy: CED L60WGP

First Floor

Assemble the first floor step by step

Build the upper timber frame, breeze-block walls, support beams, stairway and working hoist through 36 clearly highlighted placement steps.

Print list: CW-0068 ×1 • CW-0095 ×10 • CW-0097 ×2 • CW-0099 ×1 • CW-0103 ×1 • CW-0105 ×1 • CW-0106 ×2 • CW-0107 ×2 • CW-0108 ×1 • CW-0109 ×2 • CW-0110 ×5 • CW-0111 ×1 • CW-0112 ×1 • CW-0113 ×1 • CW-0114 ×2 • CW-0170 ×3

Step 1 of 37
Step 1: the cyan outline shows the Wood Greebling Post 60mm to place.
Place the highlighted piece Wood Greebling Post 60mm CW-0095Legacy: CED L60WGP


Second Floor

Assemble the second-floor step by step

Build the second-floor walls, railings, timber posts, stairs, floor and breeze-block details through 33 clearly highlighted placement steps.

Print list: CW-0068 ×1 • CW-0095 ×10 • CW-0100 ×1 • CW-0115 ×1 • CW-0118 ×3 • CW-0119 ×2 • CW-0120 ×1 • CW-0122 ×1 • CW-0123 ×1 • CW-0133 ×1 • CW-0143 ×1 • CW-0156 ×1 • CW-0157 ×3 • CW-0160 ×1 • CW-0163 ×1 • CW-0165 ×1 • CW-0166 ×3

Step 1 of 34
Step 1: the cyan outline shows the breeze block window jetty to place.
Place the highlighted piece Breeze Block Window Jetty CW-0120Legacy: SD BBWJ


Third Floor

Assemble the third-floor step by step

Build the third-floor frame, walls, roof details and working swing jib through 38 clearly highlighted placement steps.

Print list: CW-0068 ×2 • CW-0093 ×1 • CW-0095 ×5 • CW-0106 ×2 • CW-0107 ×1 • CW-0120 ×2 • CW-0124 ×1 • CW-0125 ×1 • CW-0126 ×1 • CW-0127 ×3 • CW-0128 ×1 • CW-0129 ×2 • CW-0130 ×2 • CW-0131 ×2 • CW-0132 ×1 • CW-0133 ×2 • CW-0134 ×1 • CW-0135 ×1 • CW-0136 ×1 • CW-0137 ×2 • CW-0138 ×1 • CW-0143 ×2 • CW-0147 ×1

Step 1 of 39
Step 1: the cyan outline shows the breeze block window pent to place.
Place the highlighted piece Breeze Block Window Pent CW-0127Legacy: SD BBWP


Fourth Floor

Assemble the fourth-floor step by step

Build the fourth-floor walls, roof sections, timber frame and floor through 26 clearly highlighted placement steps.

Print list: CW-0068 ×2 • CW-0095 ×5 • CW-0120 ×1 • CW-0123 ×1 • CW-0127 ×2 • CW-0129 ×3 • CW-0133 ×1 • CW-0136 ×1 • CW-0139 ×1 • CW-0140 ×1 • CW-0141 ×1 • CW-0142 ×2 • CW-0143 ×1 • CW-0144 ×1 • CW-0145 ×1 • CW-0149 ×1 • CW-0256 ×1

Step 1 of 27
Step 1: the cyan outline shows the breeze block window corbel to place.
Place the highlighted piece Breeze Block Window Corbel CW-0123Legacy: SD BBWC


Fifth Floor

Assemble the fifth-floor step by step

Build the fifth-floor roof structure, gables, awning and ladder through 17 clearly highlighted placement steps.

Print list: CW-0095 ×4 • CW-0123 ×1 • CW-0129 ×2 • CW-0139 ×1 • CW-0140 ×1 • CW-0144 ×1 • CW-0145 ×2 • CW-0146 ×1 • CW-0147 ×1 • CW-0148 ×1 • CW-0166 ×2

Step 1 of 18
Step 1: the cyan outline shows the breeze block window corbel to place.
Place the highlighted piece Breeze Block Window Corbel CW-0123Legacy: SD BBWC


Sixth Floor

Assemble the sixth-floor step by step

Build the sixth-floor room, fireplace floors, corbels and pent walls through 10 clearly highlighted placement steps.

Print list: CW-0095 ×3 • CW-0097 ×1 • CW-0127 ×2 • CW-0136 ×1 • CW-0150 ×2 • CW-0166 ×1

Step 1 of 11
Step 1: the cyan outline shows the breeze block window pent to place.
Place the highlighted piece Breeze Block Window Pent CW-0127Legacy: SD BBWP


Loft

Assemble the loft step by step

Build the loft roof, coping crowns, supporting beams and gable frame through 15 clearly highlighted placement steps.

Print list: CW-0068 ×3 • CW-0129 ×6 • CW-0139 ×1 • CW-0152 ×2 • CW-0154 ×1 • CW-0155 ×1 • CW-0255 ×1

Step 1 of 16
Step 1: the cyan outline shows the cross coping crown to place.
Place the highlighted piece Cross Coping Crown CW-0129Legacy: RR CCPC