Underkeep Conclave · Early Access

Swarf Docklands Foundations

Build your docklands from the waterline up. Create sturdy quays, weathered wharves, jetties and sprawling waterfront settlements designed for adventures at the edge of the tide.

10 guided foundation builds • 180 combined build steps

Built for the waterfront

A foundation for every harbour story

Swarf Docklands Foundations give your waterfront real height, weight and character. The modular walls, braced posts, coping beams and dock floors lock together into a convincing dockside platform—ready to support warehouses, cranes, taverns or whatever waits beyond the fog.

Choose from compact single and double foundations, broad quad platforms, low-profile harbour bases, storm-drain builds and hidden Rat Warren routes—then rearrange the modular parts to shape your own shoreline.

Harbour Single Foundation

Assemble this harbour single foundation step by step

Follow the highlighted part through all 17 steps to build one compact Swarf Docklands foundation.

Print list: CW-0037 ×4 • CW-0012 ×4 • CW-0052 ×4 • CW-0033 ×4 • CW-0040 ×1

Step 1 of 18
Step 1: the cyan outline shows the first wall panel to place.
Place the highlighted piece Double Harbour Wall CW-0037 Legacy: DH DHW

Harbour Double Foundation

Assemble this harbour double foundation step by step

Follow the highlighted part through all 27 steps, including the two new centre T-posts, to build the wider foundation.

Print list: CW-0037 ×6 • CW-0012 ×4 • CW-0069 ×2 • CW-0052 ×4 • CW-0070 ×2 • CW-0033 ×6 • CW-0068 ×1 • CW-0040 ×2

Step 1 of 28
Step 1: the cyan outline shows the top corner connector to place.
Place the highlighted piece Wood Connector Elbow Locked 60mm CW-0052 Legacy: CE L60W

Docklands Harbour Quad

Assemble the Docklands Harbour Quad step by step

Build a broad four-bay harbour foundation with double wall panels and a full perimeter of coping beams. Follow the highlighted component through all 16 steps.

Print list: CW-0072 ×4 • CW-0012 ×4 • CW-0052 ×4 • CW-0084 ×4 • CW-0076 ×1

Step 1 of 17
Step 1: the cyan outline shows the outer corner post to place.
Place the highlighted piece Braced Mooring Post Elbow 8mm CW-0012 Legacy: SD BMPE8

Docklands Harbour Single Rat Warren Exit

Assemble the Docklands Harbour Single Rat Warren Exit step by step

Create a compact harbour foundation with a concealed Rat Warren exit, sewer ladder and grated manhole. Follow the highlighted component through all 19 steps.

Print list: CW-0037 ×3 • CW-0081 ×1 • CW-0012 ×4 • CW-0052 ×4 • CW-0033 ×4 • CW-0090 ×1 • CW-0077 ×1 • CW-0079 ×1 • CW-0087 ×1

Step 1 of 20
Step 1: the cyan outline shows the culvert wall panel to place.
Place the highlighted piece Harbour Wall with Large Culvert SD HWLC Legacy: SD HWLC

Docklands Harbour Double Drain

Assemble the Docklands Harbour Double Drain step by step

Build a double harbour foundation around a large storm drain and cracked dockside floor. Follow the highlighted component through all 18 steps.

Print list: CW-0072 ×2 • CW-0037 ×2 • CW-0012 ×4 • CW-0052 ×4 • CW-0033 ×2 • CW-0084 ×2 • CW-0083 ×1 • CW-0085 ×1 • CW-0086 ×1

Step 1 of 19
Step 1: the cyan outline shows the wall panel to place.
Place the highlighted piece Double Harbour Wall CW-0037 Legacy: DH DHW

Docklands Harbour Quad Straight Rat Warren

Assemble the Docklands Harbour Quad Straight Rat Warren step by step

Add a straight Rat Warren beneath a large harbour foundation, complete with culvert access and sea steps. Follow the highlighted component through all 17 steps.

Print list: CW-0072 ×2 • CW-0073 ×1 • CW-0074 ×1 • CW-0012 ×4 • CW-0052 ×4 • CW-0084 ×4 • CW-0076 ×1 • CW-0089 ×1

Step 1 of 18
Step 1: the cyan outline shows the outer corner post to place.
Place the highlighted piece Braced Mooring Post Elbow 8mm CW-0012 Legacy: SD BMPE8

Docklands Harbour Quad Elbow Rat Warren

Assemble the Docklands Harbour Quad Elbow Rat Warren step by step

Turn the underground route beneath a quad harbour foundation with the elbow Rat Warren floor assembly. Follow the highlighted component through all 17 steps.

Print list: CW-0072 ×2 • CW-0073 ×1 • CW-0074 ×1 • CW-0012 ×4 • CW-0052 ×4 • CW-0084 ×4 • CW-0076 ×1 • CW-0088 ×1

Step 1 of 18
Step 1: the cyan outline shows the outer corner post to place.
Place the highlighted piece Braced Mooring Post Elbow 8mm CW-0012 Legacy: SD BMPE8

Docklands Low Harbour Single

Assemble the Docklands Low Harbour Single step by step

Assemble a compact low harbour foundation with a large storm drain set into the dock floor. Follow the highlighted component through all 17 steps.

Print list: CW-0082 ×4 • CW-0078 ×4 • CW-0071 ×4 • CW-0033 ×4 • CW-0083 ×1 • CW-0080 ×1

Step 1 of 18
Step 1: the cyan outline shows the low wall panel to place.
Place the highlighted piece Low Harbour Wall SD LHW Legacy: SD LHW

Docklands Low Harbour Double

Assemble the Docklands Low Harbour Double step by step

Build a longer low-profile waterfront foundation using single and double wall sections. Follow the highlighted component through all 16 steps.

Print list: CW-0082 ×2 • CW-0075 ×2 • CW-0078 ×4 • CW-0071 ×4 • CW-0033 ×2 • CW-0084 ×2 • CW-0085 ×1

Step 1 of 17
Step 1: the cyan outline shows the low wall panel to place.
Place the highlighted piece Low Harbour Wall SD LHW Legacy: SD LHW

Docklands Low Harbour Quad

Assemble the Docklands Low Harbour Quad step by step

Create the widest low-profile docklands footprint with four double walls and a continuous coping edge. Follow the highlighted component through all 16 steps.

Print list: CW-0075 ×4 • CW-0078 ×4 • CW-0071 ×4 • CW-0084 ×4 • CW-0076 ×1

Step 1 of 17
Step 1: the cyan outline shows the low double wall panel to place.
Place the highlighted piece Low Double Harbour Wall DH LDHW Legacy: DH LDHW